The notched joists are cut and moved around to the front of the house. Tomorrow the roof goes up, or as much of it as I can manage. I'm gonna try and rent a wallboard lift to raise the 3/4" OSB up to the roof level, 'cause that is bitch-ass heavy. I am sweaty and full of sawdust, and I am beat. I'm gonna shower after I get a bit of energy back and then see about dinner if I can work up the gumption to nukerowave something. I have some leftover chinese food that might be good, but it might be too much work. I'm thinking that tonight there will be sleep.