Tom Ramcigam (magicmarmot) wrote,
Tom Ramcigam
magicmarmot

Into the tedium stuff that I need to do. Prewiring, trying to determine what stuff I'll need, like phone, ethernet, speakers, doorbell, low-voltage lighting. Drilling holes through the brick for access, but hiding the conduit behind the brickwork before I seal it up permanently. I'm thinking of adding one really big PVC conduit race for future LV stuff.

I still don't know how I'm going to wire the lighting on the outside eaves.
Tags: Big Broken Box™
Subscribe
  • Post a new comment

    Error

    default userpic

    Your reply will be screened

    Your IP address will be recorded 

    When you submit the form an invisible reCAPTCHA check will be performed.
    You must follow the Privacy Policy and Google Terms of use.
  • 0 comments